​520-396-3553

Call us your for free estimate

    Trinity Kitchen and Bath, LLC

Step 3 - Hand Fabrication and Quality Control

Once a template is complete our fabrication craftsmen will match the template to the selected slabs and will move pieces until we obtain the best color match and flow for your countertop.

 We take our time and prepare the positioning of each piece on the slab to ensure the best fit. We look over each piece and detail by hand; thus ensuring that each linear inch of your kitchen is perfect in shine and color. Although we use state of the art polishing machines, you can not get the same quality detailing with out an experienced fabricator.


All major cuts, edging, shaping and polishing are done at our fabrication facility.This process takes anywhere from 7-10 working days, depending on how big your project is.

Delivering

the home you deserve!

Step 2 - Template

Once you have selected your stones, we will send out a staff members to template your cabinet layout. This is the template that will be used to custom fabricate your countertops. It is important that you are present for the template, as any change or special request must be done at this time. The template is to ensure that you are getting the most accurate slab layout and that all the necessary information is collected to ensure the perfection of the finish product.

During this appointment we will finalize details (sink type, edging, etc.) and commence your project


SELECT THE PERFECT EDGE FOR YOUR GRANITE COUNTERTOPS

Step 1 - Slab Selection

Every great granite countertop starts with a great granite slab. That’s why we take great lenghts to ensure that our suppliers only deliver the highest quality of stone available.  We invest a lot of time searching available granite suppliers,  for the best quality material for the price. With over 800 colors choices to select from,  a granite yard is a must see.


Visit your local slab supplier below to make an appointment

 

Trinity Kitchen & Bath Llc Refacing Cabinets Granite Custom Countertops Cabinetry

Step 4 - Installation


The installation process is the last step to complete your project. Our team will arrive promptly at the time previously scheduled with you. . Please help us in securing a clear walking path from the back or front door and into the work area (kitchen, bathroom, etc.). Please remove any items from your countertops. Our normal installation requires only 1 day in most cases.   Our team will leave everything in the exact manner as in which we arrived. Once complete we seal your countertops if the material requires it.

We also take great care of your home. We place coverings on the ground so not to scratch your floors, make sure any furniture that can be damaged is out of the way.   When we done we will clean up the work area and take all the trash with us. We respect your home just like we respect ours.

Lic#304844

Bonded and Insured